Section B - MWF 10:30 am - 12:30 pm

Cheng-Ling Chang(Brad)Instructor (Mechanical engineering) 

email: changlin@uw.edu

Mike , Teaching Assistant (Mechanical engineering)

email: micfain@u.washington.edu 

Students Spring 2011

 

General

Date

Class Activities

Handouts/Resources

Assignments

Due Dates

WEEK 1

=<29/09/2010>28/Mar./2011

 

 

Class introduction &

Find your group member &

Introduction of Spaghetti Water Tower project

 

 Syllabus

Introduction of Spaghetti Water Tower porject

Memo Tips,

Memo Examples, EX1  EX2

 

Introduction of yourself Memo

(Group Assignment)

 

 

(1 week)

 

30/Mar./2011

 

 

Spaghetti Water Tower construction and Test

 

Handout of function of Team and design process

Engineering Design process

 

Tower Memo

(Individual Assignment)

 

 

(1.3 week)

01/Apr./2011

 

 

 

 

 

 Introduction to Bridge project

& Component Test

Introduction to Bridge Project

Bridge Project Slide Show

Bridge Web Resources

West Point Bridge Software

WPB Software Instructions

Introduction to Components Testing

Component test data sheet

 

Bridge Ideas

(Individual Assignment)

 

Components test Memo

(Individual Assignment)

 

 

(1.3 week)

 

 

(1.6 week)

WEEK 2

04/Apr./2011 

Prototype Design/Construction

 Memo grading policy and  Force Analysis

 

 
06/Apr./2011 

Prototype Construction

 

 

 
08/Apr./2011 

 Prototype Construction

 

 

 

WEEK 3

11/Apr./2011

Prototype Construction

 

 Prototype  bridge performance

(Group assignment)

(2 weeks)

13/Apr./2011

 Prototype Construction

 

 

 
15/Apr./2011 

 

 

 

Prototype Testing

Pictures of Testing day

Bridge Final Presentation

(Group assignment)

Bridge Final Report

(Group assignment)

 

(1.6 week)

 

( 2 weeks)

 

WEEK 4

18/Apr./2011

Revision / construction

 

 

 
20/Apr./2011 

Final Bridge Construction

 

 

 
22/Apr./2011 

Final Bridge Construction

 Examples of presentation slides

 EX1, EX2, EX3

 

 

WEEK 5

25/Apr./2011

Final  bridge testing

                      T-Day

 

 

 
27/Apr./2011 

Bridge presentation

 

  Teammate evaluation

(Individual assignment)

(1 week)

29/Apr./2011 

Introduction to  Engine

& Testing

Engine dissection

Introduction to Engine Project

Slide show

U of Windsor On-Line Manual

How things work

Internal combustion engine

 

 

 

 

 

WEEK 6

 

 

 

 

 
02/May./2011 

Engine Assembly

 

Engine Report  

(Individual assignment)

(1.3 week)

04/May./2011  

 

Engine: Assembly& Testing

 

 

Engine Questions

(Group assignment)

(1 week)

06/May./2011 

 

Robot Project Introduction

 Inventory

Robot project introduction

Robot project slide show

RCX tutorial

NQC tutorial

 Pathfinder construction
(Group assignment)
 

(1 week)

WEEK 7

09/May./2011 

 

Pathfinder Construction

NQC download

 

 
11/May./2011 

 RCX Code Programming

 

 

 
13/May./2011 

Pathfinder testing

Robot construction

 

 Programming assignment
(Individual assignment)

 

(1.3 week)

WEEK 8

16/May./2011

 Gear mechanics and sensors

Competition schedule

 

 
18/May./2011 

Round 1 test runs (base point assessment)

     
20/May./2011 

Construction and testing

 

 Final  report (Group assignment)

( 2 week)

WEEK 9

23/May./2011 

 

Construction and testing

 

 

 
25/May./2011 

 

 

 

 
27/May./2011 

Revising & testing

 

 

 

WEEK 10

30/May./2011 

 Revising & testing

 

Teammate evaluation

(Individual assignment)

 

( 1 week)

 

01/June/2011

 

Final Competition

 

 

 
03/June/2011

Class Wrap Up

Course Evaluations

 

 

 

College of Engineering | University of Washington | Contact COE | Search
Copyright © 1999-2007 University of Washington

*       Home

*       Current Quarter

*       Instructors

*       What is ENGR 100

Top of Form

 

Bottom of Form