Earth and Space Sciences 426, Spring 2008
Fluvial Geomorphology Instructor: Nancy Brown Email: nbrune11@gmail.com Office: Johnson 163 Office Hours: Tuesday and Thursday 1:30-2:30 or by appointment Telephone: (206) 616-1084 Green River Valley Project
The field trip to the Green River Valley will be on Saturday May 17, 2008. Here is the field trip guide for Green River. Here is the Green River online GIS lab. Note: if too many people are using this site at the same time, it will run very slowly. Here is the tree data that you all collected at the Green River. Important Dates
Fieldtrips will be taken on the following dates: Saturday April 19, 2008: Swamp Creek Sunday May 4, 2008: North Creek Saturday May 17, 2008: Green River Valley Fieldtrip report due dates (all are due at the beginning of class): Thursday May 1, 2008: Draft report #1 Tuesday May 13, 2008: Final report #1 AND Abstract for report #2 AND independent project proposals (if needed to make-up a missed fieldtrip) Tuesday May 27, 2008: Final report #2 Thursday June 5, 2008: Final report #3 AND independent projects Course Information
Syllabus: This is the finalized syllabus with all the correct dates. Course Goals: These are from the Spring 2006 class, but they are pretty much the same for this year. Trip Report Guidelines: This includes what to bring on the field trip, the grading criteria, and some recommendations for writing technical reports. Lectures
Copies of the lecture notes will be printed out before each lecture. You may request an electronic copy of the notes from Prof. Brown. Below are a series of pdfs of the lectures given in past years. These are similar to this year's lectures and in the same basic order that we'll use this year, but they are in an outline form. Download them if you like, you may find them useful: Meeting Times and Locations
Lecture: Tuesday/Thursday 10:30-11:50 in JHN 022 Lab: Some Fridays 10:30-12:20 in JHN 011. Mondays after fieldtrips we will have time in the computer lab from 9:30-12:20 in JHN 021. This is not a mandatory lab period, but it is encouraged that you come to the computer lab to compile and share your data with your group and the entire class. |
Teaching Assistant
Name: Dan Morgan
Email: djmorgan@u.washington.edu Office: ATG 134 Office Hours: Monday and Wednesday 12:30-1:30, or by appointment Office Phone: (206) 543-5255 North Creek Data
The field trip to North Creek will be on Sunday May 4, 2008. Here are the strikes for the for cross sections: Cross section 1: 9Cross section 2: 19 Cross section 3: 30 Cross section 4: 78 Here is the field trip guide for North Creek. Here is an excel spreadsheet that you might find useful for entering your data. Cross section 1: Updated May 13, 2008 Cross section 2: Updated May 13, 2008 Cross section 3: Updated May 13, 2008 Cross section 4: Updated May 13, 2008Swamp Creek Data
The field trip to Swamp Creek will be on Saturday April 19, 2008. Here is the project guideline for Swamp Creek. When it comes time to enter your data into Excel, you may find this spreadsheet useful. This spreadsheet is simply intended to help you get started entering your data. You may need to alter it so that it works for the way your group collected data. I will post data from the field trip here: Cross-section #1 (upper section): Updated 4/30/08. I updated one cell on the areas for the velocity profile so that the entire area of the cross-section is included. This should increase the total discharge from 3.76 m/s to 3.87 m/s. If you have time to fix your calculations from this, go ahead and do that. If you don't have time to fix this before the draft is due, don't worry about it for now, but do fix it for your final version. Cross-section #2 (middle section): Updated 4/25/08 Cross-section #3 (lower section): Updated 4/27/08. New! This now has vertical velocity profiles! Longitudinal Profile: Updated 4/25/08 Floodplain Profile: Updated 4/25/08 |
||||||||||||
|
Send mail to: djmorgan@u.washington.edu
Last modified: 5/30/2008 11:11 AM |
||||||||||||||