Appendix C
SNAP Road Use
First 20 Years
Herrington Bridge Run With 30 MMBF Harvest Limit
These runs were produced using SNAP. Based on travel costs, construction costs, and harvest prices it produces a harvest and transportation analysis to determine what areas should be harvested and how the harvest will get to the mill. The following analysis was done beginning in 1997 and runs in five year increments. Therefore period 1 is equivelant to the routes used between 1997 and 2002.
No Herrington Bridge Run With 30 MMBF Harvest Limit
These runs were produced using SNAP. Based on travel costs, construction costs, and harvest prices it produces a harvest and transportation analysis to determine what areas should be harvested and how the harvest will get to the mill. The following analysis was done beginning in 1997 and runs in five year increments. Therefore period 1 is equivelant to the routes used between 1997 and 2002.