Design Progress
The last month the whole BJ CANE team has been making a hard push to finish the drive train design. We have encountered many bumps along the road in regards to the coupling system, the strengths of our motor shafts and piecing the whole system together. But with a lot of hard work and sacrificing some of our precious sleep, we have been able to construct a full SolidWorks assembly and complete parts list. We are now in the process of piecing together our final report and instruction manual.
Drive System Assembly Explosion
Drive System
System Side Profile
Nick re-installing the engine sled.
Colin Brett and John assembling the Fiero's engine sled.
The engine bay setup for measurement.