Washougal Bridge Project
February 8, 1999
University of Washington
Forest Engineering 444

UW Forest Engineering 1999 Senior Class


I Executive Summary
The executive summary gives a brief, yet detailed description of each subject.
II Recommendations
The recommendations announce our final decisions as well as the basic reasoning behind these decisions.
III Objectives
The goals of our project are outlined in this section.
IV Site Description
A detailed description of our project sites.
V Hydrologic Analysis
An in depth discussion of our methods for determining hydrologic data for our project sites.
VI Bridge Design
A detailed discussion of the methods used to determine our final recommendations for the crossing of the Little Washougal River.
VII Culvert Design
An extensive review of the methods used to determine our final recommendation for the crossing of Miner Creek.
VIII Road Design
A description of the changes that will need to be made to the road design performed by last year's class.
IX Conclusions
A brief recap of the major findings from this project.
X References
An extensive list of references used in this project.
XI Appendices
Various figures and calculations used to support the design aspects of the project.
XII Time/Assignment Accounting
A description of the tasks assigned to each team member and the time required to complete those tasks.