John's Creek Watershed Analysis
March 19, 1999
University of Washington
Forest Engineering 423/523
John's Creek Project Team
I
Recommendations
The recommendations announce our final decisions as well as the basic reasoning behind these decisions.
II
Objectives
The goals of our project are outlined in this section.
III
Site Description
A detailed description of our project site.
IV
Soils Layer -- Susan
The methods used for creating a soils coverage.
V
Streams Layer -- Beth
A detailed discussion of the methods used to create the streams layer.
VI
DEM -- Beth
A description of the methods used to create the DEM layer.
VII
Wetlands Layer -- Beth
A discussion of how to create a wetlands layer.
VIII
Hydrology Module -- Beth
A discussion of the methods used and results obtained from the Hydrology Module.
IX
Surface Erosion Module -- Susan
A discussion of the methods used and results obtained from the Surface Erosion Module.
X
Mass Wasting Module -- Susan
A description of the methods used and results obtained from the Mass Wasting Module.
XI
Channels Module -- Flo
A description of the methods used and results obtained from the Channels Module.
XII
Riparian Module -- Flo
A description of the methods used and results obtained from the Riparian Module.
XIII
Fish Module -- Tim
A description of the methods used and results obtained from the Fish Module.
XIV
Public Works/Water Supply Module -- Alec
A description of the methods used and results obtained from the Public Works/Water Supply Module.
XV
Water Quality Module -- Alec
A description of the methods used and results obtained from the Water Quality Module.
XVI
Conclusions
A brief recap of the major findings from this project.