COST ANALYSIS

The cost analysis includes determining costs for road construction, harvest system owning and operating costs, and stump to truck yarding costs. The 1999 and 2000 capstone reports both contain a lot of information on cost analysis. See 1999 Hoodsport CD for a road construction cost spreadsheet (highlead/fe/pack_forest/pack_1999/hoodsport_99/transportation/docs/DNR_roadcosting.xls), and 2000 Burnt Mountain CD for stump to truck yarding cost spreadsheets (See Report chapter 8 and highlead/fe/pack_forest/pack_2000/production/CostResults). Other good costing tools can be found on the USFS Region 6 website.

Back to Outline

Office: Mar. 25 - Apr. 13 Field: Apr. 16 - May 11
Office: May 14 - June 7

Overhead (meetings)

Field Work

Final Setting Design
Preliminary Planning   Final Road Design
First Day at Pack Forest   Final Alt. Harvest Sys. Analysis
Office Setup   Final Timber Modeling

Project Management Start-up

  Cost Analysis
Data Collection   Report
Basemaps   Final Maps
Production Equations   Presentation
Watershed Analysis   Presentation to DNR
Preliminary Timber Modeling   Project Mgmt Data Compilation

Preliminary Setting Design

 

Report Due

Prelim. Alt. Harvest Sys. Analysis    
Preliminary Road Design    

Preliminary Report Work

   
Field Preparation    
Field Maps